Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-5127

No logging for Success Criteria PI change

XMLWordPrintable

    • 1
    • Severity 3 - Minor
    • No

      Issue Summary

      Success Criteria updates PI when the previous PI is set to Done but no logging exists in the system to reflect this.

      Steps to Reproduce

      1. Set up a Success Criteria for an Epic spanning multiple PIs
      2. Set the assigned PI to Done
      3. The Success Criteria PI will update to the next PI in the list.
      4. Check the audit log - no record of the change is recorded.

      Expected Results

      The Audit Log reflects the changed PI
      or
      Setting the PI to Done does not update the PI on the Success Criteria

      Actual Results

      The PI is updated on the Success Criteria
      and
      No record is made in the Audit Log to show why the change was made.

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

            dfuller@atlassian.com Don Fuller
            120524bf6ade Jose Sanchez
            Votes:
            1 Vote for this issue
            Watchers:
            3 Start watching this issue

              Created:
              Updated:
              Resolved: