• 3
    • Our product teams collect and evaluate feedback from a number of different sources. To learn more about how we use customer feedback in the planning process, check out our new feature policy.

      Updated the description based on the feedback from 27-03-2023

      The request is to get the ability to control the way the sync of the Jira Sprints data is handled by the Jira Connector independently from the 'Create sprints from Jira' (now called "Sync sprints from Jira") setting.
      This means controlling the bi-directional sync of:

      • Sprint Name
      • Sprint Start/End
      • Sprint Goal
      • Sprint Status (start/completed)

          Form Name

            [JIRAALIGN-4848] Bi-directional sync support for sprint data

            SET Analytics Bot made changes -
            Support reference count New: 3
            Edvaldo Lima made changes -
            Assignee Original: Cap Smith [ csmith1@atlassian.com ] New: Andrew Zhang [ 2d32ad8bdc34 ]
            Francois Panaget made changes -
            Description Original: Updated the description based on the feedback from 27-03-2023

            The request is to get the ability to control the way the sync of the Jira Sprints data is handled by the Jira Connector independently from the 'Create sprints from Jira' setting.
            This means controlling the bi-directional sync of:
            * Sprint Name
            * Sprint Start/End
            * Sprint Goal
            * Sprint Status (start/completed)
            New: Updated the description based on the feedback from 27-03-2023

            The request is to get the ability to control the way the sync of the Jira Sprints data is handled by the Jira Connector independently from the 'Create sprints from Jira' (now called "Sync sprints from Jira") setting.
            This means controlling the bi-directional sync of:
            * Sprint Name
            * Sprint Start/End
            * Sprint Goal
            * Sprint Status (start/completed)
            Don Fuller made changes -
            Status Original: Gathering Interest [ 11772 ] New: Future Consideration [ 11775 ]
            Björn Wiehe made changes -
            Labels New: BW1
            Björn Wiehe made changes -
            Remote Link New: This issue links to "Page (Confluence)" [ 757562 ]
            Francois Panaget made changes -
            Description Original: Updated the description based on the feedback from 27-03-2023

            1 switch for “Sync Sprint Data”
            (feel free to separate it in sub-switches)
            to sync Sprint Name
            to sync Sprint Start/End
            to sync Sprint Goal
            to sync Sprint Status (start/completed)

            With the 10.116 release, we introduced the Sprint Goal sync updates from [Jira to Jira Align|https://help.jiraalign.com/hc/en-us/articles/115000088393-Jira-data-synchronization#:~:text=Jira%20Software%20Sprint%20becomes%20Sprint%20in%20Jira%20Align].

            The ability to sync bi-directionally the Jira Sprint Goal along with its status would be great to make sure no information is lost/overridden when someone updates the Sprint Status & Goal either on Jira or on Jira Align.

             
            New: Updated the description based on the feedback from 27-03-2023

            The request is to get the ability to control the way the sync of the Jira Sprints data is handled by the Jira Connector independently from the 'Create sprints from Jira' setting.
            This means controlling the bi-directional sync of:
            * Sprint Name
            * Sprint Start/End
            * Sprint Goal
            * Sprint Status (start/completed)
            Francois Panaget made changes -
            Description Original: With the 10.116 release, we introduced the Sprint Goal sync updates from [Jira to Jira Align|https://help.jiraalign.com/hc/en-us/articles/115000088393-Jira-data-synchronization#:~:text=Jira%20Software%20Sprint%20becomes%20Sprint%20in%20Jira%20Align].

            The ability to sync bi-directionally the Jira Sprint Goal along with its status would be great to make sure no information is lost/overridden when someone updates the Sprint Status & Goal either on Jira or on Jira Align.

             
            New: Updated the description based on the feedback from 27-03-2023

            1 switch for “Sync Sprint Data”
            (feel free to separate it in sub-switches)
            to sync Sprint Name
            to sync Sprint Start/End
            to sync Sprint Goal
            to sync Sprint Status (start/completed)

            With the 10.116 release, we introduced the Sprint Goal sync updates from [Jira to Jira Align|https://help.jiraalign.com/hc/en-us/articles/115000088393-Jira-data-synchronization#:~:text=Jira%20Software%20Sprint%20becomes%20Sprint%20in%20Jira%20Align].

            The ability to sync bi-directionally the Jira Sprint Goal along with its status would be great to make sure no information is lost/overridden when someone updates the Sprint Status & Goal either on Jira or on Jira Align.

             
            Francois Panaget made changes -
            Summary Original: Bi-directional sync support for sprint data (Goal, Status, Dates New: Bi-directional sync support for sprint data
            Francois Panaget made changes -
            Summary Original: Bi-directional sync support for sprint Goals and Status New: Bi-directional sync support for sprint data (Goal, Status, Dates

              2d32ad8bdc34 Andrew Zhang
              646db21d89d1 Francois Panaget
              Votes:
              4 Vote for this issue
              Watchers:
              6 Start watching this issue

                Created:
                Updated: