Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-4615

Changing Feature's rank creates audit log entries for all Features in backlog even if that item's rank didn't actually change

XMLWordPrintable

    • 2
    • Severity 3 - Minor
    • No

      Issue Summary

      While on the Backlog for Features, if you move the rank position of one Feature, all the ones present on the view will have an audit log entry created, like:

      Release Portfolio Rank : : Feature (Jira Epic) XXXX was moved from rank Y to Y

      Steps to Reproduce

      1. On the Feature Backlog set a Portfolio + PI
      2. Change the rank of one Feature
      3. Check the audit log of a different one to see the message

      Expected Results

      TBD by PM team.

      Actual Results

      Even Features that had no changes will display the message on the audit log.

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

              dfuller@atlassian.com Don Fuller
              a8cff3407f0b Diego Larangeira
              Votes:
              3 Vote for this issue
              Watchers:
              6 Start watching this issue

                Created:
                Updated:
                Resolved: