-
Bug
-
Resolution: Fixed
-
High
-
10.57
-
3
-
Severity 2 - Major
-
-
Sprints removed from a board under Jira Align Admin > Jira Management > Boards would be able to be reinstated
-
Sprints are not able to be reinstated. There is a white box instead of the reinstate button. This does not occur every time but is reproducible in local test environments.
-
Batman! - RHP4, A-Team - Usher1
Jira Align Admin > Jira Management > Boards: Removed Sprint is not able to be reinstated
STR:
1. Map a Jira Project to a Jira Align Program
2. Map a Jira Scrum Board to a Jira Align Agile Team
3. Create sprints in the Backlog of the Jira Board and align them to Jira Align anchor sprints
4. Remove Sprints from the Jira Align Admin > Jira Management > Board
AR:
Sprints are not able to be reinstated. There is a white box instead of the reinstate button. This does not occur every time but is reproducible in local test environments.
ER:
Sprints removed from a board under Jira Align Admin > Jira Management > Boards would be able to be reinstated
- mentioned in
-
Page Loading...
- resolves
-
ALIGNSP-1526 Loading...