Enterprise Insights: make available the field "Override Weeks" from the Plan Capacity

XMLWordPrintable

      Inside the Forecast, there is the page for "Plan Capacity", which can be accessed if the Portfolio is using the estimation system as T-Shirt or MW/TW. On this page, it is possible to set a value for "Override Weeks", which is used as a basis for the calculation of "Planned Capacity".
      Currently, the field "Override Weeks" is not available on EI, and due to this, reproducing the values for "Planned Capacity" can be hard in case the default value is not in use.

      The field in question that would be good to have on EI is:

        1. override_week.png
          389 kB
          Diego Larangeira

            Assignee:
            Munna (Inactive)
            Reporter:
            Diego Larangeira
            Votes:
            2 Vote for this issue
            Watchers:
            6 Start watching this issue

              Created:
              Updated:
              Resolved: