-
Bug
-
Resolution: Fixed
-
Low
-
10.87
-
None
-
1
-
Severity 3 - Minor
-
X-Men - VH5
Problem
Scrum Master can change a story's sprint assignment during an in-progress sprint.
- This issue is only for In Progress Sprints.
- In the Team Room, a Scrum Master for the Sprint cannot change the Sprint for a specific Story.
- The warning message is: Sprint is in progress. Only a team coach can change this
Steps to Reproduce
- The System Role needs to be RTE
- The Sprint Role needs to be Scrum Master
- In Team Room try to click on Story with a Sprint in Progress.
- Try to change the Sprint for the story, you will not be allowed (grayed out).
- Hover over the warning sign and it says: Sprint is in progress. Only a team coach can change this
Expected Results
Per our documentation, Scrum Master should be able to make this change.
Actual Results
The warning message is: Sprint is in progress. Only a team coach can change this
Workaround
- If we change the Sprint Role from Scrum Master to Team Coach, then the issue is fixed.
- Another workaround is to drop the Story; this allows the Scrum Master to make change the Sprint in the Story.
Notes
- is related to
-
ALIGNSP-7668 Loading...
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...