[JIRAALIGN-2350] Jira Sprints: One Jira Align sprint is mapped into two different Jira Sprint.

XMLWordPrintable

    • Type: Bug
    • Resolution: Not a bug
    • Priority: High
    • None
    • Affects Version/s: 10.82
    • Component/s: Jira Connector
    • None
    • 2
    • Severity 2 - Major
    • None

      Issue Summary

      During board sync, there are cases when Jira Align maps two different Jira Sprint into 1 Jira Align sprint. This will cause the JA sprint to switch twice every board sync cycle.

      Steps to Reproduce

      1. Sync a Jira board into Jira Align and make sure there are several sprints on it.
      2. Set the Sprint bugger days to 3.
      3. Create a PI/Release and set your anchor dates with a 5 days difference from Jira.
      4. Perform a board sync

      Expected Results

      1 Jira sprint should be mapped to 1 JA sprint.

      Actual Results

      2 different Jira sprints are mapped with the same JA sprint.

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

              Assignee:
              Kyle Foreman (Inactive)
              Reporter:
              Leo.Soronio
              Votes:
              4 Vote for this issue
              Watchers:
              8 Start watching this issue

                Created:
                Updated:
                Resolved: