Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-1293

[JIRAALIGN-1293] Sprint Status Report: Task type icons should differ depending on the task type

    XMLWordPrintable

Details

    • Bug
    • Resolution: Fixed
    • Medium
    • 10.70
    • 10.66
    • None
    • 1
    • Severity 3 - Minor
    • Batman! - SCORP1

    Description

      Issue Summary

      The sprint status report currently displays all task icons as 'enablement' tasks. This should differ based on the task type

      Steps to Reproduce

      Prerequisites: There should be a program and PI that have a set of valid sprints configured. There should be a story in the sprint. The story should contain one task of each type available.

      1. Open Sprint Status report (/ProjectDetailReport) with the program and PI from the prerequisites selected in the context menu
      2. In the drop-down select the sprint from prerequisites
      3. Navigate to the story and click on the story progress bar to expand the task list
      4. Validate if each task has the corresponding icon

      Expected Results

      Each task type has the icon which corresponds to the legend

      Actual Results

      All task icons are equal to the 'enablement' task type

      Workaround

      Currently, there is no known workaround for this behavior. A workaround will be added here when available

      Attachments

        Issue Links

          Activity

            People

              cgottlieb@atlassian.com Caz (Inactive)
              vvyhovskyi@atlassian.com Vitalii Vyhovskyi
              Votes:
              1 Vote for this issue
              Watchers:
              10 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Backbone Issue Sync