-
Bug
-
Resolution: Fixed
-
Medium
-
10.66
-
None
-
1
-
Severity 3 - Minor
-
Batman! - SCORP1
Issue Summary
The sprint status report currently displays all task icons as 'enablement' tasks. This should differ based on the task type
Steps to Reproduce
Prerequisites: There should be a program and PI that have a set of valid sprints configured. There should be a story in the sprint. The story should contain one task of each type available.
- Open Sprint Status report (/ProjectDetailReport) with the program and PI from the prerequisites selected in the context menu
- In the drop-down select the sprint from prerequisites
- Navigate to the story and click on the story progress bar to expand the task list
- Validate if each task has the corresponding icon
Expected Results
Each task type has the icon which corresponds to the legend
Actual Results
All task icons are equal to the 'enablement' task type
Workaround
Currently, there is no known workaround for this behavior. A workaround will be added here when available
- relates to
-
JIRAALIGN-1320 Jira Align Iteration Status Report - Inconsistent Verbiage
- Closed