-
Bug
-
Resolution: Fixed
-
High
-
10.65
-
None
-
1
-
Severity 2 - Major
-
A-Team - SCORP 3
Issue Summary
Release Progress: Burnup chart>Scope is the same for Burnup by Features and Burnup by Stories
Steps to Reproduce
- Login to the instance that has Program and PI with a valid data set
- Go to PI Progress report with these Programs and PI selected in the Context Menu.
- Check Scope line in Program Increment Burnup (By Feature) and Program Increment BurnUp (By Story)
Expected Results
Based on the nature of these two charts they should be different. And according to Help:
By Feature: Scope = Sum of all Effort Points on child stories of features on each day of the report Time period
By Story: Scope = Sum of All Effort Points on stories on each day of the report time period
Actual Results
The scope line is absolutely the same for both charts.
Workaround
Currently there is no known workaround for this behavior. A workaround will be added here when available
- resolves
-
ALIGNSP-2108 Loading...
-
ALIGNSP-2300 Loading...