• 1
    • Severity 3 - Minor
    • 0

      Issue Summary

      Forms date format is not the same as Jira date format

      Steps to Reproduce

      1. update the jira date format by following this KB  Changing the Date Time Range Picker format to 24h format & Change the time format to 24 hours in Jira
      2. Link Jira date time picker custom field to a proforma field
      3. Add a date field to a form
      4. Load the form
      5. The Jira custom field displays in 24hours format but proforma will not load it in 24hors format.

      Expected Results

      For the date format to match the one used within Jira

      Actual Results

      Date format is dd/mm/yyyy

      Workaround

      Using a Text field with A4J to change the date & time format:

              96eee84c9242 Sanyam Singh (Inactive)
              dgedda@atlassian.com Devisree Gedda
              Affected customers:
              3 This affects my team
              Watchers:
              4 Start watching this issue

                Created:
                Updated:
                Resolved: