Uploaded image for project: 'Confluence Data Center'
  1. Confluence Data Center
  2. CONFSERVER-34636

Moving a page with tasks causes task owner to change

    XMLWordPrintable

Details

    Description

      Moving a page with assigned tasks on the page, causes the actual owner of the task to change for some of the tasks.

      To reproduce:

      • Create two blank pages (named One and Two).
      • Create another page as a child page under page One.
      • Add two tasks by the creator of the page for themself, and two tasks for an additional user.
      • Log out and log in as the second user you assigned two tasks to.
      • Add two additional tasks to this page for this user, and two for the original user.
      • Now have this second user move the page with Tasks to be a child page of page Two.
      • Now browse to this user's Tasks. At least one of their tasks will be missing.
      • Log in as the original user and check the Tasks. They will have one additional.

      I think there are probably many variations of this. I can't quite determine the magic formula.

      Attachments

        Issue Links

          Activity

            People

              Unassigned Unassigned
              mrawson Miranda Rawson
              Votes:
              1 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: