Uploaded image for project: 'Clover'
  1. Clover
  2. CLOV-514 Polish off test optimization move to core
  3. CLOV-435

Ensure intitial test case duration calculations are sane

    XMLWordPrintable

Details

    Description

      Currently, since test for multiples runs are being loaded (span setting is incorrect), start to end test run duration can be very long (days, weeks).

      Attachments

        Issue Links

          Activity

            People

              Unassigned Unassigned
              mstudman Michael Studman (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: