Uploaded image for project: 'Bamboo Data Center'
  1. Bamboo Data Center
  2. BAM-20144

Specs updates from IDE will re-enable UI editing on plans created through RSS

    XMLWordPrintable

Details

    Description

      Steps to Reproduce

      1. Create a plan using repository specs feature
      2. Checkout specs project from outside Bamboo and use an IDE to update the plan permissions with a different setting

      Expected Results

      1. Updates from IDE should not be possible if the plan is configured to use repository specs.
      2. The Plan should still keep its readonly state.

      Actual Results

      The plan is updated and now will be editable by users with permissions.

      Attachments

        Issue Links

          Activity

            People

              Unassigned Unassigned
              dsantos Daniel Santos
              Votes:
              1 Vote for this issue
              Watchers:
              4 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: