Details
-
Suggestion
-
Resolution: Unresolved
-
None
-
8
-
13
-
Description
Problem Definition
As a build administrator I want to change the Bamboo build number to another number to preserve continuity of build numbers when migrating from other continuous integration systems.
Suggested Solution
Add a form field in build administration where the build number can be changed.
Workarounds
The build number can be reset by cloning the existing plan to create a replacement. The build number can be increased using a SQL query. The build number cannot be decreased due to conflicts with multiple tables that reference the past builds.
For complete details of the workarounds please see Unable to change the current build number in Bamboo
Attachments
Issue Links
- is duplicated by
-
BAM-2864 Users should be able to reset plan build numbers via the UI
- Closed
-
BAM-3581 Document how to integrate with projects using custom build ids or numbers
- Closed
- is related to
-
BAM-14453 Implement a global build numbering scheme that doesn't start at '1' on branch builds
- Closed
- relates to
-
BAM-2622 Allow Bamboo build number to be determined from Perforce or Subversion changeset/changelist
- Closed
-
BAM-1166 Build Number should be configurable (e.g. to track Perforce Change Numbers)
- Gathering Interest
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...