Uploaded image for project: 'Migration Platform'
  1. Migration Platform
  2. MIG-1352

App pre-migration checks running after removing all apps from migration

    XMLWordPrintable

Details

    • Bug
    • Resolution: Fixed
    • Low
    • None
    • JCMA - 1.8.2
    • None
    • Minor

    Description

      Issue Summary

      This is reproducible on Data Center: yes

      Steps to Reproduce

      1. Create a migration plan including only a Stage 1 app marked as 'needed in cloud'
      2. Run preflight checks
      3. Remove app using the 'Remove 1 app from this migration' button from failed reliability check

      Expected Results

      No app checks are triggered if all apps are removed

      Actual Results

      All app checks re-run showing successful results

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

      Attachments

        Issue Links

          Activity

            People

              715b90e1400c Martina James (Inactive)
              25cabb4d3ff8 Maite Eguren Brown
              Votes:
              1 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: