Description
Issue Summary
When migrating from the server to the cloud using JCMA, the sprint id gets changed. After the migration of confluence pages, the sprint ids don't get updated and the chart/jira macro doesn't load the Jira issues included in the sprint.
This is reproducible on Data Center: (yes)
Steps to Reproduce
- In Jira DC/Server, Create a sprint.
- In Confluence DC/Server, Insert the JQL on confluence pages as mentioned in the article Insert the Jira issues macro. Ex: project = <PKEY> AND Sprint = <ID>
- Migrate the Jira project using JCMA and then migrate the confluence space using CCMA.
Expected Results
The sprint id should be updated in the pages or the ID should remain the same after migration
Actual Results
The sprint doesn't load because it uses the ID from the server. Refer attached screenshots.
Workaround
Manually update the sprint ids in the confluence pages.