-
Bug
-
Resolution: Tracked Elsewhere
-
Low
-
None
-
6.2.5.1
-
None
-
6.02
-
Steps to reproduce:
- Create an Epic
- Create an issues with subtask
- Assign the subtask, and leave the parent issue as unassigned
- Configure the swimlane based on Epic
- Go to Work Mode and click on the quick filter "Only My Issue"
- Notice the Epic swimlane is missing since the parent task is unassigned
Note: Some users use the story as a requirement page and work on the sub-task instead. This behavior causing user unable to track down from which Epic the sub-task belongs to.
Expected behavior:
The swimlane shouldn't be missing when the quick filter is activated, although the parent issue task is unassigned
- relates to
-
JSWSERVER-6471 GreenHopper shouldn't allow sub task to be listed in the scrum board if the parent issue is excluded
- Closed