The linking between epics and stories should be easier and more transparent

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Answered
    • None
    • Component/s: None
    • None

      Epics are quite nice to structurize a project but Jira still lacks in transparency and usability concerning the link process and reporting capabilities. Here are my suggestions:

      • Links between issues and epics should be visible in the "issue links" section
      • In the "plan" view of the Rapid Board issues linked to an epic are only visible as long as they are in the backlog or in the current active sprint
      • Adding an issue to an epic should be possible using the "link" command additionally to the existing "drag and drop" functionality in tha rapid board

              Assignee:
              Unassigned
              Reporter:
              Florian Buhl
              Votes:
              1 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated:
                Resolved: