Suggestion
-
Resolution: Unresolved
-
None
-
2
-
1
-
The value displayed within the estimate field is different in Plan and Work mode . This is confusing, as one would expect to see the same information in this field, regardless of the mode.
Either allow both Original and Remaining to be visible on the card, or always use/show the Remaining estimate.
Currently, you see Original Estimate in Plan Mode, but Remaining Estimate in Work mode when you have Time Tracking (Remaining Estimate and Time Spent) configured for estimation in the board configuration.
- is related to
-
JSWSERVER-10606 As a developer I would like to see both the original estimate and remaining estimate on a card in work mode so I can see how I'm tracking (when time-tracking is enabled)
- Gathering Interest
- relates to
-
JSWSERVER-3922 As a user, I would like to configure the cards displayed in the rapid board
- Closed
-
JSWSERVER-5794 As a user, I want to associate "Remaining Estimate" as the Estimation Statistic on an agile board
- Gathering Interest
-
JSWSERVER-7252 As a user I would like to be able to see the remaining estimate summary in Plan mode for the started Sprint
- Gathering Interest