Team capacity iteration duration does not accept floating number

XMLWordPrintable

    • 8.22
    • 1
    • Severity 3 - Minor

      Issue Summary

      This is reproducible on Data Center: (yes)

      Steps to Reproduce

      1. Create a new Kanban project with sample issues.
      2. Create a new plan and linked to the kanban board.
      3. Change the plan view settings to group by "Teams"
      4. In "Teams" tab, edit the teams and put 300 capacity hours.
      5. Create a new Epic and link to a Team. Then, link to a story.
      6. You should see 37.5 per weekly planning.
      7. If you modify one of the weekly planning from 37.5 to 37 and submit the changes. It works.
      8. However, if I change it back to 37.5 is not possible anymore.

      Expected Results

      Based on the fact that team capacity can be measured using floating numbers, it should allow user manually change the duration iteration to a decimal numbers.

      Actual Results

      Team capacity does not accept the floating number for an individual weekly iteration after submit the changes.

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

            Assignee:
            Unassigned
            Reporter:
            John Chin (Inactive)
            Votes:
            1 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated: