Allow Issues in Epic to be replaced by issue links when moving an Epic to another issue type

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Unresolved
    • None
    • Component/s: Epics
    • None
    • 3

      Currently, when moving an Epic to some other issue type, the issues previously associated with the Epic are left unlinked.

      It'd be nice to allow the "issues in Epic" previously linked to the Epic to be linked to the new issue type through any of the pre-existing issue link types.

      Eg.

      Epic PA-1 with stories PA-2 and PA-3 is moved to issue type "Initiative".

      One of the move steps prompts the user to choose the new link type for PA-2 and PA-3, so they can now be "depends on", "blocks", etc.

            Assignee:
            Unassigned
            Reporter:
            Rodrigo Martinez
            Votes:
            1 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated: