Sprint board - Backlog - move to top button

XMLWordPrintable

      It would be helpful if you have move to top button beside ticket in backlog. It can be a problem and a waste of time to drag several tickets, one by one, to the top of a backlog. Move to top button would sort that out. Or maybe add to sprint (from backlog).

            Assignee:
            Unassigned
            Reporter:
            Mario Savatovic
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated: