Summary
Converting days to weeks in Control Chart disregards working days configuration.
Steps to reproduce
- Have issue in the Kanban board which was in certain status (lets say In Progress) status from Jan 3rd to Feb 20th (total of 34 working days)
- Configure board to have 5 working days only
- Refer to Control Chart report > choose status In Progress
Expected Result
The time duration will be shown as 6 weeks 4 days, as the total working days is divided by 5 (working days configured in a week)
Actual Result
The time duration is shown as 4 weeks 6 days, the total working days is divided by 7