-
Bug
-
Resolution: Unresolved
-
Medium
-
None
-
7.6.1, 7.8.0, 7.8.2, 7.9.2, 7.11.1, 7.13.3, 8.22.0, 9.12.8
-
None
-
7.06
-
12
-
Severity 2 - Major
-
3
-
Summary
The Workload by Assignee does not show the correct remaining time for subtasks. It sums up the Remaining Time estimate to the assignee of the parent task instead of to the actual assignees.
Steps to Reproduce
- Create issue 1 (estimate it 1h) and issue 2 (estimate it 1h)
- Create subtask of issue 1 (estimate it 30min)
- Add the issues to a Sprint
- Assign the issue 1 to user A and issue 2 to user B
- Assign the subtask of issue 1 to assignee B
Expected Results
The remaining time estimate should show 1h 30minutes for the assignee B
Actual Results
The remaining time estimate shows 1h 30minutes for the assignee A
Workaround
No workaround available
- was cloned as
-
JSWCLOUD-16166 The Workload by Assignee shows the remaining time for subtasks as a sum in the parent task instead of to the assignee
- Closed
- mentioned in
-
Page Loading...