Add Feature to Calculate Sum up Time Estimate for Epic

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Unresolved
    • None
    • Component/s: None
    • None
    • 1
    • 4

      Summary
      When a user accesses goes to generate a Time Estimate report, the report is only available at issues level.

      Feature Request
      Can a feature be added to generate this report at Epic level similar to what is present in JIRA portfolio or as available for stories?

      Extra Features

      Adding on to the above feature, can a similar Time tracking as seen for stories and sub-task with the option to add the sum of time from sub-task to the story proper be added to Epics?

      As illustrated in attached file.

        1. Example_Epic sumup.pptx
          185 kB
          Ismael Olusula Jimoh

            Assignee:
            Unassigned
            Reporter:
            Ismael Olusula Jimoh (Inactive)
            Votes:
            8 Vote for this issue
            Watchers:
            6 Start watching this issue

              Created:
              Updated: