On the board 'Work' tab, sprint pulldown can't be closed.

XMLWordPrintable

    • 6.06

      On the "Work" board, near the top left, is the sprint name. It has a small pulldown to allow you to edit the sprint dates. However, there is no way to close that pulldown- it actually persists through changing to plan or report as well. It does eventually time out, and it goes away if you click a link that requires a page refresh.

              Assignee:
              Unassigned
              Reporter:
              Paul Becotte
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated:
                Resolved: