-
Suggestion
-
Resolution: Duplicate
-
None
-
0
-
At the moment, you would need to click on the swimlane issuekey to open up the short summary screen on the right of Rapid board in Work Mode to see the Story points estimation. It would be great if we can show the Story Points estimation in the swimlane view as well. The small requirement such as this could means a lot in an Agile development.
- duplicates
-
JSWCLOUD-17610 Ability to configure fields to be displayed on story swimlanes
- Gathering Interest
- is duplicated by
-
JSWCLOUD-7724 As a user I want to see the estimate of a story easily in Work mode
- Closed
-
JSWCLOUD-8863 Add remaining estimate sum to owner headings on scrum board
- Closed
-
JSWCLOUD-9006 As a Team Member/Scrum master I want to see the total estimate/remaining time per swimlane
- Closed