Epic and sub tasks dates inheriting

XMLWordPrintable

      1) Epics should automatically inherit due date from the latest date added into a subtask. There should be also an possibility to change Epic due date manually.

      2) All subtasks should inherit start date from an Epic, and to have the possibility to change it manually.

            Assignee:
            Unassigned
            Reporter:
            joanna.szalkowska
            Votes:
            0 Vote for this issue
            Watchers:
            5 Start watching this issue

              Created:
              Updated:
              Resolved: