Bug
-
Resolution: Fixed
-
High
-
None
-
20
-
Severity 3 - Minor
-
2
-
Issue Summary
When setting up a sprint to end on March 31th in the board, the plan in Advanced Roadmaps will show this sprint as ending on March 30th.
Steps to Reproduce
- Create a sprint in a board. Set its end date and time.
- Create a plan in Advanced Roadmaps to include that sprint.
- Group the plan by Team or Sprint, then click on the sprint box to reveal the sprint fly-out.
Expected Results
The sprint end date should be the same as the sprint end date in Jira.
Actual Results
The sprint end date in the plan is shown as one day sooner than the sprint end date in Jira.
Workaround
Currently there is no known workaround for this behavior. A workaround will be added here when available
- relates to
-
JSWCLOUD-20583 Resolve Inconsistencies between Sprint End Dates of Boards and Advanced Roadmaps
- Closed
-
JPO-17519 Loading...
-
JPO-19623 Loading...
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...