Details
-
Bug
-
Resolution: Timed out
-
Low
-
5
-
Severity 3 - Minor
-
Description
Issue Summary
When adding value for the story points estimates in the right-side panel, it does not update the story points estimate on the card view.
Steps to Reproduce
- Create a next-gen/Classic project.
- Enable feature backlog.
- Enable feature estimation.
- Create a new issue.
- Select the issue in the backlog tab.
- In the right-side panel, add value for the story points estimate field.
- The card will not update.
- Change the issue's assignee at the right-side panel.
- The card is updated with the new assignee and the new value for the story points estimate field.
According to the screenshot above, the card shows 7 story points estimate, the left-side panel show 9 story points estimate.
Expected Results
The card should automatically refresh the value for the story points estimate field.
Actual Results
The card is not updating the story points estimate field when we change it at the right-side panel.
Workaround
Refresh the page.