Provide an easier way to drag/drop issues in a long backlog

XMLWordPrintable

      Problem Definition

      As a Jira user, when viewing a project backlog I plan out a quarter's worth of sprints at a time. The trouble I run into is by default it seems that I get a large backlog >300 (related to the same sprint or different ones) making scrolling fairly difficult and drag and drop functionality also becomes tricky.

      Suggested Solution

      • If I have a way to collapse part of the backlog it would be great.

      For example:

      • if I go through and collapse each sprint, it becomes much easier.

      Why this is important

      • Ease a lot of the pain to drag and drop in a long backlog.

      Workaround

      • A workaround for now is the "Move to - Bottom of column" feature.

            Assignee:
            Unassigned
            Reporter:
            Fares Abbes (Inactive)
            Votes:
            1 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated:
              Resolved: