Switching of sprint order from one board affects another board

XMLWordPrintable

    • 1
    • Severity 3 - Minor

      Summary

      Switching of sprint order from one board affects another board.

      Environment

      Steps to Reproduce

      • Create 2 Scrum boards that are display the same project issues.
      • Create Sprint X and assign some issue
      • Setup the order of future sprints in the Backlog of Board #1
        • Sprint X
        • Sprint A
        • Sprint B
      • Setup the order of future sprints in the Backlog of Board #2
        • Sprint X
        • Sprint 1
        • Sprint 2
      • In Board #2, move the Sprint 1 and Sprint 2 to the Top
        • Sprint 1
        • Sprint 2
        • Sprint X

      Expected Results

      The order of the Sprints in Board #1 should remain the same.

      • Sprint X
      • Sprint A
      • Sprint B

      Actual Results

      The order of the Sprints in Board #1 is affected by the changes on the Board #2

      • Sprint A
      • Sprint B
      • Sprint X

        1. Sprint Board1.png
          Sprint Board1.png
          149 kB
        2. Sprint Setup.png
          Sprint Setup.png
          150 kB

            Assignee:
            Unassigned
            Reporter:
            Ramon M (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            4 Start watching this issue

              Created:
              Updated:
              Resolved: