The Burndown Gagdet should have an option available on the configuration settings to select which kind of Time Tracking will be presented on the gadget

XMLWordPrintable

      Summary

      The burndown report has an option to select which kind of Time Tracking will be presented on the report.

      • Story Points
      • Original Time Estimate
      • Issue Count

      The Burndown gadget, on the other hand, doesn't have an easy way through the UI to select these options. The only way to change from story points to hours is by navigating to the Estimation tab of the Project's Board Settings.

      Steps to Reproduce

      1. Create a gadget and a burndown report
      2. Verify the options available for Time Tracking on the report
      1. Add a burndown gadget on a dashboard
      2. There's no option to select the Time Tracking

      Ideal Results

      There should be an option available on the gadget configuration to select which kind of Time Tracking will be presented on the gadget.

      Actual Results

      The user must access the estimation tab of his board settings to change this.

      Screenshot Showing the behavior below