As a Scrum Master I need workload by assignee in Remaining Time Estimate, not Original Time Estimate

XMLWordPrintable

      The 6.6.0 Agile boards added the 'Workload by assignee' table, which is amazing and should solve a lot of our problems regarding dealing with specialists on the boards.

      We use Original Time Estimate as our primary estimation statistic, as opposed to Story points.

      I need this tool to tell me how much time people are taking on in to the sprint, NOT how much the issue had assigned to it in total.

      If I had a ticket with a 2 day estimate that rolled over from the previous sprint with 4 hours remaining on it, then that's only 4 hours that individual has on them in them in the next sprint - that's the information I need to be able to see.

      Set this as a blocker because this is absolutely key to our workflow and will prevent us moving from the classic boards.