-
Bug
-
Resolution: Fixed
-
Low
-
9
-
Severity 3 - Minor
-
Summary
Two transitions to the same status with different conditions. Only one should display in the sprint board, according to the condition, but both are showing up.
Steps to Reproduce
- Create a workflow with two statuses, e.g. To do and In Progress.
- Set two transitions to In Progress with conditions. (e.g. One with transition with the Original Estimate field =! NULL and the other one with the Original Estimate field = NULL)
Expected Results
When moving an issue from To do to In Progress in a Sprint, you should see only one transition, according to the condition which the issue matches.
Actual Results
When moving an issue from To do to In Progress in a Sprint, you can see both transitions and when you drag the issue to the transition which does not match the condition, an error occurs:
Can't move (issue ID). You might not have permission, or the issue is missing required information. If you keep having this problem, contact your JIRA Administrator.
Workaround
No workarounds.
- mentioned in
-
Page Loading...