Option to add a story directly to your sprint

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Unresolved
    • None
    • Component/s: Front-end API
    • None

      Sometimes urgent stuff (e.g. production issues) come up during a sprint.

      It would save time we can add these directly to the sprint. As now I need to add them to the backlog & drag them into the sprint.

      This is not logical since there is a difference between a backlog & a sprint.
      And adding sprint-work to the backlog first is counter-intuitive.

      This could be implemented by a simple "Create" button at the bottom of the sprint which adds it to the current sprint just as if I add it to the backlog + drag it into the sprint thereafter.

              Assignee:
              Unassigned
              Reporter:
              Michael Besems
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: