Uploaded image for project: 'Jira Data Center'
  1. Jira Data Center
  2. JRASERVER-75783

Brand-new workflow draft on the "Text" tab shows workflow's last edited date, even when the draft is brand-new.

    XMLWordPrintable

Details

    • Bug
    • Resolution: Unresolved
    • Low
    • None
    • 9.4.6
    • None

    Description

      Issue Summary

      On Jira 9.4.6, when you create a brand-new draft, click to edit it, and go to the "Text" teab, Jira will show a pop saying this draft was last edited on a date that is actually the date the workflow was last edited. Brand-new drafts can't have a last edited date, as it's new.

      After performing any changes, the last edited date will update properly.

      This issue is not present on Jira 9.8 but 9.4.x is LTS so this is why I'm raised this request.

      This is reproducible on Data Center: YES

      Steps to Reproduce

      On Jira 9.4.6, click to Edit an existing Workflow, go the the "Text" tab, a second pop-up will rise with an incorrect last edited date:

      Actual Results

      Issue Summary

      Expected Results

      Like we have on the the "Diagram" tab, this pop-up is not present and the correct time is shown on the right side when changes are made:

      Workaround

      Not available

      Attachments

        Activity

          People

            Unassigned Unassigned
            3645502bbf60 Lucas
            Votes:
            2 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

              Created:
              Updated: