Dedicated sizing (Story Points) for subtasks

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Won't Fix
    • None
    • Component/s: None
    • None

      Hi,

      actually it is not possible to size features or issues which are subtasks in order to size the Sprint-effort. It would be great if JIRA allows the sizing of each dedicated sub task, to assign a sub task to a dedicated user and the accumalation of the different subtaks-.sizings in the main task!

      Best regards, Christian

              Assignee:
              Unassigned
              Reporter:
              Christian Mooser
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: