-
Bug
-
Resolution: Duplicate
-
High
-
None
-
3.0.3
-
None
-
3
-
After logging work done, there is no way to correct a mistake.
If I log 6 hours, but meant to log 4, there is no way for me to fix this.
Our "time tracking reports" need to be accurate, and this is preventing that.
- duplicates
-
JRASERVER-2411 Ability to edit and remove work logs
- Closed