-
Suggestion
-
Resolution: Fixed
-
None
-
5
-
It would be great if the time tracking default unit to be configurable. For example, in the Original estimate field if we enter "10", it's interpreted as 10mins. Also, when this field is displayed, it automatically convert to other units. For example, we enter "10d" and Jira convert this to "2w". It would be nice to be able to set the base unit of the time tracking field.
- is duplicated by
-
JRASERVER-2558 Minimum time periods are not configurable
- Closed
-
JRASERVER-12509 Log work entry default time period should be configurable
- Closed
-
JRASERVER-14639 Make hours the default if no units entered
- Closed