Uploaded image for project: 'Jira Data Center'
  1. Jira Data Center
  2. JRASERVER-45205

Moving issue between projects will keep the assignee, even if the user is not allowed to assign

    XMLWordPrintable

Details

    Description

      Steps to Reproduce

      1. Create two test projects;
      2. Give Assignable permission in the Project 1 to a single user.
      3. In the Project 2, remove the assignable permission from the specific user.
      4. Move the issue between the projects.
      5. The user will continue assigned to the issue, even though the user does not have assignable permission in the Project 2

      Expected Results

      The issue should be reassigned according to the Default Assignee configurations of the target project.

      Actual Results

      The issue will continue assigned to the original user in the Project 1 even if the user has no permission to be the assignee.

      Workaround:

      Reassign the issue after moving it to the target project

      Attachments

        Issue Links

          Activity

            People

              Unassigned Unassigned
              psouza Pedro Souza
              Votes:
              1 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: