Details
-
Bug
-
Resolution: Fixed
-
Medium
-
6.4
-
6.04
-
Description
Create 2 JIRA classic scheme projects and 1 JIRA Agile project and consider below 3 cases:
#1. When, using Top Nav Project drop down list I switch between two of mine JIRA classic projects, ProjectKey/Id is refreshed in my hyperlinks. Please refer to screenshot "Links with JIRA classic projects.png"
#2. But when I switch from a JIRA classic project to JIRA Agile project, ProjectKey/Id is not updated in my hyperlinks. Please refer to screenshot "Links with JIRA Agile project wrong project key.png".
#3. After selecting agile project, if I refresh the screen, I can see the right ProjectKey/Id in my links.
Please refer to screenshot "Links with JIRA Agile project right project key.png".
Essentially, while I switch between non-agile projects these links are updated with selected ProjectKey/Id. But when I switch from a non-agile project to an agile project, ProjectKey/Id is not updated until I refresh the screen.
Attachments
Issue Links
- is duplicated by
-
JRACLOUD-65754 Project navigation leading to wrong page
- Closed
-
JRASERVER-43784 Project field is pre-filled with the wrong value
- Closed
- clones
-
ACJIRA-404 Loading...
- was cloned as
-
JC-355 Loading...