-
Suggestion
-
Resolution: Duplicate
-
None
-
None
-
Standalone.
Java Version 1.6.0_03
Java Vendor Sun Microsystems Inc.
JVM Version 1.0
JVM Vendor Sun Microsystems Inc.
JVM Implementation Version 1.6.0_03-b05
Java Runtime Java(TM) SE Runtime Environment
Java VM Java HotSpot(TM) Client VM
User Timezone Europe/Copenhagen
User Locale English (United States)
System Encoding ANSI_X3.4-1968
Operating System Linux 2.6.22-14-server
OS Architecture i386
Application Server Container Apache Tomcat/5.5.20
Database type mssql
Database JNDI address java:comp/env/jdbc/JiraDS
Database URL jdbc:jtds:sqlserver://217.116.236.38:1433/jiradb
Database version 09.00.3054
Database driver jTDS Type 4 JDBC Driver for MS SQL Server and Sybase 1.2.2
External user management OFF
Database Statistics
Issues 1046
Projects 8
Custom Fields 7
Workflows 0
Users 30
Groups 12
Standalone. Java Version 1.6.0_03 Java Vendor Sun Microsystems Inc. JVM Version 1.0 JVM Vendor Sun Microsystems Inc. JVM Implementation Version 1.6.0_03-b05 Java Runtime Java(TM) SE Runtime Environment Java VM Java HotSpot(TM) Client VM User Timezone Europe/Copenhagen User Locale English (United States) System Encoding ANSI_X3.4-1968 Operating System Linux 2.6.22-14-server OS Architecture i386 Application Server Container Apache Tomcat/5.5.20 Database type mssql Database JNDI address java:comp/env/jdbc/JiraDS Database URL jdbc:jtds: sqlserver://217.116.236.38:1433/jiradb Database version 09.00.3054 Database driver jTDS Type 4 JDBC Driver for MS SQL Server and Sybase 1.2.2 External user management OFF Database Statistics Issues 1046 Projects 8 Custom Fields 7 Workflows 0 Users 30 Groups 12
I would love a counter, that starts when you press "start progress" and then stops the count when pressing "Stop Progress". It will sum up the spent time concurrent with the work being done. - Ergo: If I go into a task five minutes in, I will see five minutes spent. If I go in ten minutes after that I will see fifteen minutes spent. When the "Stop progress" is pressed, the sum up will stop.
Then you only need to enter the "extra" time spent on an issue. - And the actual spent time when working on the issue, will automatically be filled out.
It would save us coders a LOT of clicks and entering when working on small bugs and issues.
Just to be crystal clear:
This is regarding starting / stopping the progress on an issue when a coder / supporter is working on an issue. Today he/she has to manually enter the time spent wheter the start/stop progress is pressed or not. - we would like a sum of the spent time to start when pressing start progress. - This way the reporter can follow the time spent and the assignee does not have to manually fill out this field afterwards since that part is done by JIRA automatically.
We could REALLY use this feature.
Thanks a bunch in advance. - And thanks for a fantastic tool. JIRA has already made our lives a bit easier.
Have a great weekend and I hope to see this request implemented in the future.
If you have any questions do not hesitate to send me a mail.
/Jens Bay
- duplicates
-
JRASERVER-1946 Automated time tracking
- Closed