Sprint Report includes story points estimated after the story was removed from sprint

XMLWordPrintable

    • 2
    • Severity 3 - Minor

      Issue Summary

      Currently, if you remove a non-estimated story from a sprint before it starts, and later you estimates that story while in the other sprint, the sprint report of the original sprint will include the newly estimated story points for the issue removed from the sprint.

      Steps to Reproduce

      1. Create Story A on Sprint A. Start Sprint A
      2. Move Story A to Sprint B before closing Sprint A. Close Sprint A
      3. Estimate Story A on Sprint B
      4. Generate Sprint Report from Sprint A.

      Expected Results

      Story A should appear as "Issues Removed from Sprint" but do not show any estimation or scope change, as no estimation was done to this story while in the Sprint A.

      Actual Results

      Story A appears with a scope change in it's story points estimation in the Sprint Report of Sprint A, even though it was only estimated when it was assigned to Sprint B.

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available