Details
-
Bug
-
Resolution: Timed out
-
Low
-
1
-
Severity 3 - Minor
-
Description
Issue Summary
It is possible to provide work log less than 1 minute (e.g., .1 or 0.1 which equals 6 to seconds) during workflow transition. As a result Remaining Time will be decreased by 1 minute, however, work log has entry with empty timing.
View screen does not permit to enter work log less than 1 minute.
Transition/edit screen should not proceed if the inputted log work (time spent) value is less than 1.
Steps to Reproduce
- Add "Time Tracking" field into "Edit issue" operation for a Screen Scheme for requires issue type.
- Create issue with some time estimated (e.g. 1 Hour)
- Edit issue and input "Time Spent" ".1" or "0.1"
- Check Remaining Time decreased by 1 minute
- Under "Work Log" it is not showing how much time was logged
- Look as old issue view, it is showing 6 seconds logged
Expected Results
Jira should not allow input less than 1 minute or round up work log to minutes.
Actual Results
Jira accepts work log values less than 1 minute via workflow transition.
Workaround
Currently the only way to avoid is to use minutes as minimal entry. When providing Time Spent use units - m = minutes, h = hours and do not use decimal.
Attachments
Issue Links
- mentioned in
-
Page Loading...