Move Issue does not perform a transition issue

XMLWordPrintable

    • 0
    • 10

      Steps to Reproduce:

      1. Have Project A with one issue on it (A-1)
      2. Have Project B
      3. Set A-1 to Done (make the Resolution Done)
      4. On B workflow, set post-function to Clear Resolution on To-Do status e.g..
      5. Move A-1 (Done) to B (To Do)

      Expected Results:

      1. The issue would go through the transition on the To-Do status and the post-function would be fired.

      Actual Results:
      Nothing happens. There is no history of this ticket going through any transition. No post-functions are fired.

              Assignee:
              Unassigned
              Reporter:
              Sugandha Singh
              Votes:
              7 Vote for this issue
              Watchers:
              10 Start watching this issue

                Created:
                Updated: