Remaining time is always 0 if there is work logged before the issue was estimated

XMLWordPrintable

      Summary

      Remaining time is set to 0 if there is work logged before the issue was estimated.

      Steps to Reproduce

      1. Make sure JIRA legacy mode is disabled in Time Tracking Configuration (this is set by default)
      2. Create an issue
      3. Log work to an issue
      4. Add Original Estimation for the issue

      Expected Results

      Remaining Time changes accordingly to the work logged

      Actual Results

      Remaining Time is set to 0 when work is logged
      Remaining Time is not changed when estimation is edited

      Notes

      It is possible to manually edit the Remaining field to a specific value and further logged work will be extracted from this value.

      Workaround

      Estimate the issue first and then log work on it