Bug
-
Resolution: Duplicate
-
Low
-
None
-
3.29.2
-
None
-
1
-
Severity 3 - Minor
-
Issue Summary
When converting an issue like an Epic to an Intiative, when it is already Parent Linked to an Intiative, the system does not automatically let go of the existing Parent link. It should do so since you cannot Parent link two issues at the top of the hierarchical levels, such as Initiative to Initiative.
Steps to Reproduce
- Link and Initiative to an Epic
- Convert the Epic into an Initiative
- Observe the issues are still linked
Expected Results
Newly converted initiative would not still be Parent linked to another Initative.
Actual Results
The Initiatives are still Parent Linked together, showing a yellow exclamation warning. The warning is good, but this shouldn't be happening at all.
Workaround
Convert the issue back to its previous issue type, remove the link, and convert the issue back to an initiative.
- duplicates
-
JSWSERVER-24811 Clear the Parent Link data when the Issue Type is changed and the Link isn't valid anymore
- Short Term Backlog
- is related to
-
JSWSERVER-21939 Clear the Parent Link data when the Issue Type is changed and the Link isn't valid anymore
- Closed
- was cloned as
-
JPO-15856 Loading...