Shorten the display length for the one-day event in the "Timeline" view of the Team Calendar

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Unresolved
    • None
    • Component/s: Apps - Team Calendar
    • None
    • 1

      Issue Summary

      It will be good if we shorten the display length for a one-day event in the "Timeline" view of the Team Calendar.

      The reason for this request

      Having this change suggestion is because, in some situations, the title of the Jira issue is long, which becomes a long event even if it is a one-day event. 

      The indicator can differentiate a one-day event, as in the screenshot below:

      However, it is not the best indication when multiple events stack the timeline view. Especially when the one-day event is mixed with the day-range event as screenshot below.

      The example above shows the situation as below:

      • TEST1 is a single-day event on 11th. 
      • TEST2 is a single-day event on 12th. 
      • TEST3 is a day-range event between the 9th to 12th. 
      • TEST4 is a day-range event between the 8th to 16th. 

      Desired Results

      Based on this, we want to shorten the display length for a one-day event in the "Timeline" view of the Team Calendar. For example, limit the event title display to a certain amount of length (ex: 5 characters as in the screenshot below), so that the one-day events won't be incorrectly recognized as a day-range event because it does not touch the dateline (9th and 13th for example below). 

            Assignee:
            Unassigned
            Reporter:
            Brent Lin (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated: