Updated infomation on JIRA issues of a user are overwritten by a second user after saving process

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Unresolved
    • None
    • Component/s: Integrations - Jira
    • None

      Steps to create the bug:

      1. Step: User 2 opens a User Story in Jira which has no Sprint assignment
      2. Step: User 1 assigns this US to a sprint
      3. Step: User 2 edits the US by adding an EPIC whithout refreshing the browser before and saves the changes

      Actual State:
      The sprint assignment got lost because there was an epic assignment of another user which was working with the "old" state of the Story.

      Expected State:
      The Sprintassignent of another User should not be overwritten. The EPIC link should only be added with Step 3.

       

      Jira Version: v8.13.15

              Assignee:
              Unassigned
              Reporter:
              Mehtap.Kandemir
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: